DFW Airport Programming and Schematic Design for Terminal Development Program

DFW International Airport, Texas

As part of DFW Airport’s capital improvement program which includes modernization of Terminals A, B, C and E (the four original terminals), Campos provided professional mechanical and electrical engineering services for the programming and schematic design phases for Terminal C. The scope of services included research of existing DFW Airport record drawings, site surveys to visually verify existing conditions, and updating existing drawings. Using the information gathered, schematic designs were developed. The results will be used as the basis for preparation of construction documents for the modernization efforts. 

Project Details

Location:
Terminal C
DFW International Airport, Texas

Project Size:
600,000 SF

Services Provided:
Mechanical Engineering
Electrical Engineering